Site clearing and preparation
Clearing, grubbing, and initial preparation of designated work areas.


Earthwork in the eastern region
Site clearing, excavation, fill placement, grading, and building-pad preparation for hotels, resorts, and residential developments.
How we approach the work
Before mobilization, we structure the scope around actual site conditions, design drawings and grades, available access, designated work areas, and the project’s planned sequence. This establishes how material and equipment will move through the site before field operations begin.
During execution, cuts, fill placement, grading, building pads, internal roads, and hauling are coordinated with the progress of other trades. Priorities can be adjusted by phase to release specific areas while maintaining continuity across active work zones.
The objective is not simply to move material. It is to deliver graded surfaces at the elevations and conditions defined by the project so that infrastructure, foundations, site development, and later construction can proceed on prepared ground.
Scope of work
Clearing, grubbing, and initial preparation of designated work areas.
Cuts, fill placement, and onsite material movement based on the approved scope.
Prepared surfaces for infrastructure, buildings, and later construction phases.
Site grading for access roads, internal circulation, and operational areas.
Transport of soil and aggregates to or within the project under the agreed plan.
Coordination of earthwork with other trades and active work areas.
Eastern Dominican Republic
Project inquiries
Share the location, required services, and current stage. We will assess how Lidomi can support construction or development.
Contact us